Enlarged view for Project management using best practice fourth edition of the PMBOK® and CMMISVC ® V.1.2 capacity or maturity level 2
DOI:
https://doi.org/10.18046/syt.v9i16.1030Keywords:
PMBOK ® Guide, Model, CMMI ®-DEV V.1.2, V.1.2, CMMI ®-DEV, vista, crossover, organizations, consulting, level, maturity, ability, good practice, project management.Abstract
The article presents a summary of the comparison between models CMMI ®-DEV V.1.2 and CMMISVC ® V1.2 in order to decide which of them will be held later crossing and compared with the PMBOK ® Guide Fourth Edit product, which result is a proposal for a larger view model or be used as a reference for improvement in services or consulting organizations that use for their project management best practices guide both the PMBOK ® and models CMMI.Downloads